English
Vietnam eager to develop Lien Chieu deep seaport
NGUYEN ANH DUONG 기자  |  hanoi.dzuong@engdaily.com
폰트키우기 폰트줄이기 프린트하기 메일보내기 신고하기
승인 2018.06.11  10:26:19
트위터 페이스북 미투데이 네이버 구글 msn

HANOI, June 3 (Engineering Daily) -- The government has been urging the authorities to appraise Lien Chieu Seaport, showing strong support and promising smoother sailing for the project.

Deputy Prime Minister Trinh Dinh Dung recently urged the Ministry of Planning and Investment (MPI) to appraise the capital sources and mobilization methods of investment capital at Lien Chieu port.

Besides, the DPM assigned the Danang People’s Committee to complete the pre-feasibility report for the project after the city studied MPI’s appraisal.

Based on reports of MPI and Danang city, the Ministry of Transport (MoT) was asked to build the investment planning evaluation report to submit the prime minister for approval.

The assignment of the DPM shows Vietnam’s eagerness to develop the Lien Chieu Seaport project, which is considered one of two key projects that aim to boost the central city as a main logistics center in the ASEAN and the East-West Economic Corridor (EWEC) that links Laos, Myanmar, Thailand, and Vietnam.

Although the construction of Lien Chieu Seaport in Danang has just been appraised, domestic and foreign investors are already interested in the project.

Notably, Boskalis Inter A.V is the newest foreign investor that expressed interest in joining. Wanter Jacobs, regional business manager at Boskalis, said in a document sent to MoT that the investor wants to join component A–general infrastructure.

Boskalis will collaborate with T&T Group to deploy this project, particularly in conducting the feasibility study, design, and build general infrastructure system in component A.

With a massive investment capital and handling capacity, the $1.48-billion Lien Chieu Seaport located in Danang is expected to become Vietnam’s second international gateway port, following Lach Huyen port in the north of Haiphong.

According to the city’s proposal, Lien Chieu Seaport, which would combine five functional areas, including a 50,000DWT (deadweight tonnage) harbour, another harbour which could handle 80,000-100,000DWT container ships with a loading capacity of 5,000-8,000 twenty-foot equivalent unit (TEUs), a liquid cargo harbour handling 10,000DWT ships, and an inland waterway harbour for 1,000-5,000DWT ships, as well as a logistics services area and other infrastructure.
 

NGUYEN ANH DUONG 기자 | hanoi.dzuong@engdaily.com
< 저작권자 © 엔지니어링데일리 무단전재 및 재배포금지 >
NGUYEN ANH DUONG 기자의 다른기사 보기  
폰트키우기 폰트줄이기 프린트하기 메일보내기 신고하기
트위터 페이스북 미투데이 네이버 구글 msn 뒤로가기 위로가기
이 기사에 대한 댓글 이야기 (0)
자동등록방지용 코드를 입력하세요!   
확인
- 200자까지 쓰실 수 있습니다. (현재 0 byte / 최대 400byte)
- 욕설등 인신공격성 글은 삭제 합니다. [운영원칙]
이 기사에 대한 댓글 이야기 (0)
최근인기기사
1
국토부, 제 2차 고속도로 건설계획 짠다
2
경찰로 이직하는 엔지니어, 교통분야 구멍 '숭숭'
3
[사당골]PQ 만능주의
4
8월 2주 엔지니어링 주간 입낙찰동향
5
"받으라니 받는다" 0.4점 가점 가족친화기업에 너도나도 인증 붐
6
인천도시철도 검단선 1공구 동명, 2공구 도화 낙찰
7
적정대가 받자는 건설혁신위, 기재부 설득 가능할까
8
[설계자들]정치인들의 건설포퓰리즘 활용법
9
필리핀, 해외건설업계 진입 장벽 폐지한다
10
성남금토동, 17만평대 제 3판교테크노밸리 조성된다
최신뉴스
1
8월 3주 엔지니어링 주간 입낙찰동향
2
서울시 강북 개발 확대 나선다
3
Tacloban City, Building Up Infrastructure
4
필리핀, 해외건설업계 진입 장벽 폐지한다
5
"받으라니 받는다" 0.4점 가점 가족친화기업에 너도나도 인증 붐
6
대전 1호기 소각로 대보수 들어간다
7
국토부, 3차 철도안전종합계획 손질 나선다
8
평창군, 2035년 기본계획 수립 나선다
9
The Three Major Islands are to be Provided Electricity.
10
필리핀, 전력 낙후지역에 전력공급망 갖춘다
신문사소개광고문의불편신고개인정보취급방침청소년보호정책이메일무단수집거부
명칭 : 한국엔지니어링협회  |  (07023)서울특별시 동작구 남부순환로 2017(사당동 1049-1)  |  대표전화 : 02-3019-3250  |   팩스 : 02-3019-3260
등록번호: 서울 아 02095  |  제호 : 엔지니어링데일리  |  발행인 : 이재완  |  편집인 : 염명천  |  청소년보호책임자 : 정장희  |  등록일(발행일) : 2012.04.25
Copyright © 2012 엔지니어링데일리. All rights reserved. mail to engdaily@engdaily.com