Philippines completes 2-kilometer drainage, pumping station to address flooding in Manila
상태바
Philippines completes 2-kilometer drainage, pumping station to address flooding in Manila
  • Arnold Quinoviva Balairos 기자
  • 승인 2018.06.04 09:39
  • 댓글 0
이 기사를 공유합니다

Manila, May 22 (Engineering Daily) -- The Department of Public Works and Highways (DPWH) has completed the P203.4 million flood control project that is seen to alleviate flooding around the vicinity of Manila City Hall and Intramuros during rainy season.

DPWH National Capital Region Director Melvin B. Navarro said the project which involves the construction of bigger reinforced concrete box culvert (RCBC) as drainage measuring 60 inches in diameter along the 2.27-kilometer Padre Burgos Avenue is now serviceable and linked with the newly improved Luneta Pumping Station.
 

“Floodwaters can now be easily discharged to Manila Bay with the bigger draining capacity of our pipes, plus the two submersible pumps with a capacity of 0.75 cubic meter per second,” said Director Navarro.
 
“The completion of this project is in time for the upcoming rainy season. Our goal is to directly catch the floodwaters in the area around Manila City Hall and Intramuros which will be pumped out by the newly constructed pumping station, providing convenience to pedestrians and protection to properties,” added Director Navarro.
 
The drainage was constructed at the stretch of P. Burgos Avenue from Luneta Pumping Station passing Manila City Hall to Anda Street, Intramuros.



댓글삭제
삭제한 댓글은 다시 복구할 수 없습니다.
그래도 삭제하시겠습니까?
댓글 0
댓글쓰기
계정을 선택하시면 로그인·계정인증을 통해
댓글을 남기실 수 있습니다.
주요기사
이슈포토