뉴스동향
The First Half of 2018, Stagnant or Decline in Winning ContractsNon-major Engineer Corporations decline in contract demands
The Difference between Major and Non-Major Corps. Gapping
정장희 기자  |  news@engdaily.com
폰트키우기 폰트줄이기 프린트하기 메일보내기 신고하기
승인 2018.07.06  18:18:36
트위터 페이스북 미투데이 네이버 구글 msn

The winning contracts of engineering corporations has started to decline after the industry had been stagnant for the past five years. Major corporations had succeeded in meeting their demands, but the rest have confronted contract shortages and furthermore management crisis.

The outcomes of contract demand have appeared for three consecutive years from 2016 to 2018 among top 22 corporations in engineering industry.

Dohwa Engineering Corporation(Dohwa Corp.) has increased its demand by investing in multiple businesses. They include solar energy and GTX development. The monetary statistics show sharp rise: $160 million(160M), $270M, and $320M. Similarly, the production per capita has multiplied twice: $83,000, $14,1000, and $16,1600.

Korea Engineering Consultants Corporation raised subtly in production: $106M,  $101M, and $102M. But the production per capita has appeared the utmost in the industry: 95,000M, 1.01M, and $100,000. The total sales amounted $42.6M for first quarter of 2018, however, this is -11.27% declined status compared to 2017. For the worse, business profits have plummeted to -$1.69M.

Yooshin Engineering Corporation had not been profitable before 2016 but it has changed its status to top three during the succeeding years: $86M, $1.031billion($1.031B), and $99M. Also, the production per capita remains stable ranging from $7,6895, $9,7626, to $8,3296. But it has downgraded to -$44,7828 during the quarter of this year  in contrast to this the half of business profits were surplus last year.

Kunhwa Engineering Corporation has decreased gradually both in contract demand and in production per capita: $100M, $100M, and $99.17M / $9,2194, $10,3831, and $8,5929

Saman Corporation ranked 9th in 2016 with $50.65M but has risen to $65.78M and $80.46M in following years. The increase has happened in production per capita simultaneously: $5,3691, $6,4429, and $7,5167. It is presumed Saman Corp. would return to its successful epoch  where it had ranked the first places in mid 2000s. if it stablizes its management.
Isan Corp. and Sunjin Corp. has shown unstable growth outcomes: Isan Corp. has $51.21M, $78.88M and $62.05M; Samjin Corp. has $63.97M, $69.35M, and $49.55M. Conversely, Pyunghwa Engineering Corp. has stood out in Turn Key  system and gained more business profits in contract demands: $32.98M, $31.90M, and $46.78M. Moreover, the product per capita has equivalent to that of a major corporation: $725,00M

The 9th to 12th ranked corporations are Kyongdong Engineering Corp., KG Engineering Corp., SooSung Engineering Corp., and Kyongho Engineering Corp. . Their digits are:$48.40M, $40.5M, and $42.40/ $47.96M, $51.73M, and $42.04M/ $38.99M, $40.07M, and $39.71M/ $32.09M

The corporations ranked below 12th follow: ▶Dongbu Engineering Corp. $36.95M, $28.61M, and $31.83M ▶Cheil Engineering Corp. $34.16M, $36.14M, and $30.66M ▶Seyoung Engineering Corp. $75.50M, $42.52M, and $29.15M ▶ Dongil Engineering Corp. $37.59M, $32.92M, and $27.36M ▶Sambo Engineering Corp. $36.42M, $35.52M, and $27.09M ▶Dongsung Engineering Corp. $33.36M and $26.82M (2017 and 2018) ▶Byucksan Engineering Corp. $18.03M, $17.85M, and $25.39M ▶Dasan Engineering Corp. $26.64M, $20.81M, and $25.03M ▶Shinsung Engineering Corp. $21.98M, $14.17M, and $17.22M

The industry associate has stated the overall tendency in contract demand had increased but it has started to diminish this year. Especially, he stressed the demand shortage in non-major corporations has intensified. He added the polarization between major and non-major corporations have been gapping e.g. non-major corps. have $40,000-60,000 while the other have $70,000-90,000. In the end, he assumed the rest half of the year would be competitive for the engineering corporations in obtaining contracts due to local elections. It is expected that large businesses would be ordered after the elections.

 

정장희 기자 | news@engdaily.com
< 저작권자 © 엔지니어링데일리 무단전재 및 재배포금지 >

[관련기사]

정장희 기자의 다른기사 보기  
폰트키우기 폰트줄이기 프린트하기 메일보내기 신고하기
트위터 페이스북 미투데이 네이버 구글 msn 뒤로가기 위로가기
이 기사에 대한 댓글 이야기 (0)
자동등록방지용 코드를 입력하세요!   
확인
- 200자까지 쓰실 수 있습니다. (현재 0 byte / 최대 400byte)
- 욕설등 인신공격성 글은 삭제 합니다. [운영원칙]
이 기사에 대한 댓글 이야기 (0)
최근인기기사
1
2018 엔지니어링상반기 결산…'정체되거나 꺾이거나'
2
경전철 동북선, 2년 6개월만에 실시협약 '체결'
3
법대로 발주 안하는 엔지니어링, 적정대가의 56.5%만 '먹어라'
4
7월 1주 엔지니어링 주간 낙찰동향
5
대구지하철, 2025년까지 51.2㎞ 확장 나선다
6
한남고가 철거시, 강남-종로 5㎞ 구간은 '극심정체'
7
삼안 노조, 부당노동행위 규탄 기자회견
8
CI 바꾼 한국종합기술 지주체제 강화
9
7월 2주 엔지니어링 주간 낙찰동향
10
국토부, 민자사업 추진 기준장벽 더 높인다
최신뉴스
1
Soc Trang Province Attracting Investors Increasingly
2
베트남 속짱성, 투자유치 상승세
3
For 3 years, Quang Ninh province has invested VND 30,000 billion to develop transport infrastructure
4
베트남 꽝닌성, 2016년 이후 인프라 사업에 1조4,600억원 투자
5
ENR 설계분야 100위, 순수건설ENG 中 도화 첫 테이프
6
정부, 스마트시티 시범도시 구체안 발표
7
삼우씨엠, 2018년 단장 워크샵 개최
8
엔지니어링공제, 1사1촌 봉사활동 '구슬땀'
9
7월 2주 엔지니어링 주간 낙찰동향
10
Panguil Bay Bridge Project: Mindanao’s Biggest and Longest Bridge to Start Construction This Year
신문사소개광고문의불편신고개인정보취급방침청소년보호정책이메일무단수집거부
명칭 : 한국엔지니어링협회  |  (07023)서울특별시 동작구 남부순환로 2017(사당동 1049-1)  |  대표전화 : 02-3019-3250  |   팩스 : 02-3019-3260
등록번호: 서울 아 02095  |  제호 : 엔지니어링데일리  |  발행인 : 이재완  |  편집인 : 염명천  |  청소년보호책임자 : 정장희  |  등록일(발행일) : 2012.04.25
Copyright © 2012 엔지니어링데일리. All rights reserved. mail to engdaily@engdaily.com